Click on the images for further information:

Pre-Pour PreparationTencon Slab PourTencon Concrete LevellingSlab Finishing


Pre-Pour Site Preparation

Pre-pour Site Preparation

Site preparation is similar to that used for conventional in-situ slabs. Tencon Slabs typically require a "toe" over foundation supports. This is formed using the insulation under the Tencon Slab - by leaving supports uncovered by the insulation, the Tencon Slab is locally thickened up in those regions. This results in an overall lower volume of Tencon Concrete being used and a lower cost installation for the developer.

 

 

Tencon Floor System Installation:
The installation process is similar to that used for laying conventional in-situ slabs.

There are 4 key stages:
1. Preparation
2. Concrete Pour
3. Tamp / Level and
4. Finishing

Tencon Slabs are installed by house-builders' existing groundwork contractors once given an approved status by Keskin Tencon Ltd.

Download the Tencon Floor Installation Guide

The Tencon Floor Installation Guide is available for
download here

Site Last Updated: 01/03/2008 | Keskin Tencon Ltd, 44 Ingle Head, Fulwood, Preston, PR2 3NS
Tel: 01772 715577 | Company Registration No. 4253762