Click to return to www.tencon.com home
Tencon Concrete   Tencon Floor System   Tencon Fast Base Foundation System
Overview   Process:
Design
  Process:
Installation
  Process:
Warranty

Click on the images for further information:

Pre-Pour PreparationTencon Slab PourTencon Concrete LevellingSlab Finishing


Tencon Slab Pour

Tencon Slab Pour

Tencon Concrete has good workability which means it is easily distributed over a slab's area. Note the relative ease of working with no steel mesh underfoot. Missing out the process of installing steel mesh subtracts ~½ day off the slab build process.
Tencon Concrete is supplied nationally by CEMEX to stringent quality control standards.

 

 

Tencon Floor System Installation:
The installation process is similar to that used for laying conventional in-situ slabs.

There are 4 key stages:
1. Preparation
2. Concrete Pour
3. Tamp / Level and
4. Finishing

Tencon Slabs are installed by house-builders' existing groundwork contractors once given an approved status by Keskin Tencon Ltd.

Download the Tencon Floor Installation Guide

The Tencon Floor Installation Guide is available for
download here

Site Last Updated: 01/03/2008 | Keskin Tencon Ltd, 44 Ingle Head, Fulwood, Preston, PR2 3NS
Tel: 01772 715577 | Company Registration No. 4253762