Pre-Pour PreparationTencon Slab PourTencon Concrete LevellingSlab Finishing


Tencon Slab Tamping / Levelling

Tencon Concrete Levelling

Tencon Slabs are tamped / levelled using current tamping methods. It is however much to the discretion of the groundworks contractor exactly how Tencon Slabs are installed.

Tencon recommends Multiquip's MagicScreed product (shown above) for use in the installation of Tencon Slabs.

 

Tencon Floor System Installation:
The installation process is similar to that used for laying conventional in-situ slabs.

There are 4 key stages:
1. Preparation
2. Concrete Pour
3. Tamp / Level and
4. Finishing

Tencon Slabs are installed by house-builders' existing groundwork contractors once given an approved status by Keskin Tencon Ltd.

Download the Tencon Floor Installation Guide

The Tencon Floor Installation Guide is available for
download here

Site Last Updated: 01/03/2008 | Keskin Tencon Ltd, 44 Ingle Head, Fulwood, Preston, PR2 3NS
Tel: 01772 715577 | Company Registration No. 4253762